The 2nd tee on the West course has always posed a challenge with the tee shot as you do not have a view of any target. Construction will begin this week on renovating the tee so there will be a visible view of the green on this short par 4. It will involve some grading and elevations changes to the tee along with some brush clearance to obtain a better angle and view for the tee shot. For progress photos and updates, you can view them on this post as they are made.
Monday 1/20/14- before photos
1/20/14
Bringing the dozer up the slope in front of the tee for construction to begin
1/23/14
Removing all the existing sprinkler heads so rough grading can begin
1/24/14
Rough grading has begun
1/27/14
Removal of a pine tree that was causing shade and tree root issues with the tee box
1/29/14
Removal of the old cart path
2/3/14
Now that the cart path has been removed the rough grading and earth moving can begin.
2/4/14
The rough grading is almost complete. The goal of the project is to have a visual view of the green from the green/silver and gold tees.
2/6/14
Installation of new drainage and irrigation piping has begun.
2/7/14
Installation of drainage/irrigation piping continues.
2/10/14
Finishing up with the drainage installation, and the first phase of pouring the new cart path begins. Phase 2 will happen this Wednesday when the West course is closed again
2/12/14
The new cart path was completed today. Final grading and fine tuning of the turf areas should be finished by Friday with the new sod being installed next week
2/17/14
The new Tifway Bermuda ( non overseeded ) sod installation began today.