The new tee marked out in red paint before work begins.
Creating a rough level with a sand pro machine before final grading is done by hand
Laying new hybrid bermuda sod on the tee top
The new tee is finished. Approximately 12'' of sand and soil was added to the area to be able to create a level teeing area. Should be open in about 3 weeks.